Sorry for the slow update, but the pictures were taken with our "good camera" instead of the cell phone, so I had to actually get the pictures off the camera to upload instead of having it happen instantly! How spoiled I am by technology.
Anyway, we visited the house last weekend and even though I think it was supposed to be locked, it wasn't! The sheetrock is almost done, they just have a little work to do in the basement. Otherwise, they've painted the walls (apparently with a spray gun that got everywhere), installed interior doors, and we now have cabinets! Also, the tile guy was working on a Saturday to tile the tubs and showers upstairs. So without further delay, here are the pictures.
 |
| Backyard deck and patio, there will be stairs |
 |
| Basement Rec Room and the bar |
 |
| Basement Rec Room and entrance into media room |
 |
| Bar cabinets |
 |
| More Bar Cabinets |
 |
| Media Room (still needs sheetrock) |
 |
| Wall between media room and utility room |
 |
| Back wall of media room and entrance into rec room |
 |
| Utility Room |
 |
| Kitchen Cabinets (they were all wrapped up, this was the best we could do |
 |
| Bonus Room |
 |
| Bonus Room |
 |
| Master Bath, tile in progress! |
 |
| Upstairs hall and railing overlooking foyer |
 |
| Laundry room upstairs |
 |
| guest bath upstairs |
 |
| Kitchen cabinets again, they are a little dusty |
 |
| living room |
 |
| kitchen |
 |
| kitchen |
 |
| Driveway, sidewalk, porch, and columns are in |
We have little hope that we will be able to get in this weekend because they've gotten far enough along to start locking it, but if we can get in we will post pictures. Happy Thanksgiving!